Scope of Work
- Mobilization & Layout
- Site logistics and layout coordination with general contractors and school representatives.
- Precision alignment of court perimeter per engineering plans.
- Fence Installation
- Furnishing and installation of 9-gauge black vinyl-coated chain link fencing, mounted on a galvanized framework and black powder-coated steel posts.
- Framework included terminal posts, line posts, and top rail consistent with USTA court fencing standards.
- All posts were core-drilled and set in newly poured concrete walkways to ensure long-term structural integrity and compliance with ADA clearances.
- Fence height was installed at 10’ high perimeter with divider panels between courts per project specifications.
- Gates & Hardware
- Supply and installation of access gates at designated entry points for maintenance and player access.
- Heavy-duty latches and commercial-grade hinges included to meet school safety and security codes.
Date
September 2020
Client
Glen Lake High School
Contractors
US FENCE PRO
MICHIGAN FENCE OUTLET
Project Managers
Branden Lewis, Henri Demil, Rick Porter, Giles Crouch, Brent Paterson